Activate Consistency Check |
|
CHECK_PLAN_DATA
*effective from version 3.1
A consistency check and an availability control are usually carried out if plan values are being transferred in budget and total costs planning. For total planning (activity KSTP and KSTR), the consistency check may be activated using the constant CHECK_PLAN_DATA (Value from = X).
The availability control is performed additionally.
|
Note: |
This constant replaces NO_DATA_CHECK in former FP versions (2.9 to 3.0). |