|
Period Planning: Value Variable |
|
FD_VALUE_MNTH_VAR
* available from Version 3.4
Period planning is activated via the constant MONTH_ACTIVE (see notes there).
Up to 12 satellite fields contain variable period values; these must carry the same basic field name and differ in the last two digits (01 to 02). Enter this basic field name in constant FD_VALUE_MNTH_VAR einzutragen.
|
Note: |
The constants FD_VALUE_FIX and FD_VALUE_VAR for value fields in annual planning may not be active in period planning. |
|
Note: |
Not in all cases of application, all 12 periods are used for the entry of plan data and possibly not all corresponding fields are available in the satellite. In this case, used periods may be entered separated by comma in Value to for MONTH_ACTIVE (otherwise, FP will try to read data for all 12 periods from the satellite). |