Reading Cost Centers and Assigned WBS Elements

 

KOSTL_WITH_PR

This constant can be used to control whether the WBS elements assigned to a cost center are to be included when reading data. For this purpose, the cost center must be entered as the responsible cost center in the master record of the WBS element.

Activation is performed by entering an object class (e.g. OC for overhead expenses or IV for investments) in column Value from of the constant. Multiple object classes are separated by comma (without blank space). This way, it is possible to limit reading to WBS elements of specific object classes (see field PRPS-SCOPE).

Note:

In transaction SE16, SAP frequently shows GKOST instead of OC or INVEST instead of IV (depending on the display variant). The relevant field SCOPE, however, is CHAR 2.