Dynamic determination of project level |
|
PSP_MULTI_LEVEL
* as of ProCED Version 3.2
This constant determines the project level up to which WBS elements within a project are considered for the determination of posting combinations.
The level is not always constant, but is rather dependent on the structure of the respective project: therefore, this constant allows the level to be stored in any table of the project, e.g., the Append field in the table PROJ (see also the constant of the same name in the Allevo base package, which has the same meaning).
In the field Value from enter the name of the table (e.g., PROJ), and in the field Value to enter the name of the respective field in database table. Reading is always done with the current project number. In the respective field you must enter a numerical value.
|
Note: |
The constant PSP_ACT_CUMULATE can NOT be simultaneously active (otherwise PSP_MULTI_LEVEL is ignored) |